I don't think any assembly line exists that can manufacture and deploy SMRs en masse on that kind of timeframe, even with a cooperative NRC
There have been literally 0 production SMR deployments to date so there’s no possibility they’re basing any of their plans on the availability of them.
There have been literally 0 production SMR deployments to date so there’s no possibility they’re basing any of their plans on the availability of them.