I work in the sector and it's impossible to build a full-sized reactor in less than 10 years, and the usual over-run is 5 years. That's the time for tried and tested designs. The tech isn't there yet, and there are no working analogs in the US to use as an approved guide. The Department of Energy does not allow "off-the-cuff" designs for reactors. I think there is only two SMRs that have been built, one by the Russians and the other by China. I'm not sure they are fully functioning, or at least working as expected. I know there are going to be more small gas gens built in the near future and that SMRs in the US are way off.
> it's impossible to build a full-sized reactor in less than 10 years, and the usual over-run is 5 years
I'm curious why that is. If we know how to build it, it shouldn't take that long. It's not like we need to move a massive amount of earth or pour a humongous amount of concrete or anything like that, which would actually take time. Then why does it take 15 years to build a reactor with a design that is already tried and tested and approved?
> it's impossible to build a full-sized reactor in less than 10 years
We’re not doing time and tested.
> Department of Energy does not allow "off-the-cuff" designs for reactor
Not by statute!
i don't and i honestly don't know much about it, but
> there are no working analogs in the US to use as an approved guide
small reactors have been installed on ships and submarines for over 70(!) years now. Reading up on the very first one, USS Nautilus, "the conceptual design of the first nuclear submarine began in March 1950" it took a couple of years? So why is it so unthinkably hard 70 years later, honest question? "Military doesn't care about cost" is not good enough, there are currently about >100 active ones with who knows how many hundreds in the past, so they must have cracked the cost formula at some point, besides by now we have hugely better tech than the 50's, so what gives?
Guessing SMRs are a ways off, any thoughts on the container-sized microreactors that would stand in for large diesel gens? My impression is that they’re still in the design phase, and the supply chain for the 20% U-235 HALEU fuel is in its infancy, but this is just based on some cursory research. I like the prospect of mass manufacturing and servicing those in a centralized location versus the challenges of building, staffing, and maintaining a series of one-off megaprojects, though.