Unfortunately the connection fee does not cover all fixed cost. For a long time the model has been fairly "progressive" in this regard. Some of the fixed costs of the grid have been paid for by amortization over the per Kw cost, which had the effect of charging people who used more a larger chunk of these fixed costs. Now with the option to provide your own power if you have upfront capital for solar can build as big of a system as they want. As other comments in the thread have mentioned, net-metering is largely functioned as a subsidy to give money to people who are already doing fine financially. I want green energy, and I think that decentralization has definite benefits, but it's pretty hard to argue against maintaining the grid to allow re-balancing and covering supply shortfalls in specific areas. Here is a video discussing this problem - https://youtu.be/C4cNnVK412U?si=ZzZhoApFW3khqrdq&t=720


Replies

namibjtoday at 6:53 PM

What you could do is bill per energy in e.g. 15 minute chunks, and separately bill for transformer/line capacity by e.g. the peak usage in any such chunk over the contract period, like they do in Germany for atypical load profile industrial users since decades ago.

Net metering is overall just entirely stupid as a concept; measure inbound and outbound flow separately if you can't just measure the 15 minute chunks; bill grid fees on the energy price on inbound and only pay energy price on outbound. Or even bill grid fees on outbound up to one of many available large substations, and thus handle the issue of demand across large distances making buildout of solar in a convenient but far away place not being disincentivized vs. more-demand-local buildout.