Taking a break from software to remodel a house by myself. The plan was just to redo the kitchen and a bathroom and be done by August, so naturally it's now December here in Minnesota and the house is missing most of its wiring, pipes, insulation, and walls. :) I'm having a great time though and just started producing videos about it: https://youtube.com/shorts/6QDOXxh99PY?si=NOjvNVEVHwQt180A