The heat pump generates 162MWt, at the cost of around 50MWe.
The nuclear reactor produces 1.6GWe alongside 4.5GWt.
Furthermore the listed costs are also unrelated: the 235 millions are for the bare units (and an estimate for something a few years out), while the 8bn are turnkey (of what exactly I’m not sure: the beleaguered Olkiluoto 3 and flamanville 3 cost 11~12bn, while Taishan is estimated at under 8 for two reactors).
These are… completely unrelated ratings?
The heat pump generates 162MWt, at the cost of around 50MWe.
The nuclear reactor produces 1.6GWe alongside 4.5GWt.
Furthermore the listed costs are also unrelated: the 235 millions are for the bare units (and an estimate for something a few years out), while the 8bn are turnkey (of what exactly I’m not sure: the beleaguered Olkiluoto 3 and flamanville 3 cost 11~12bn, while Taishan is estimated at under 8 for two reactors).