logoalt Hacker News

lnsrulast Tuesday at 12:54 PM2 repliesview on HN

State subsidies and insane overregulation. Think about replacing the cabinet for electricity meters (+4000€) for heat pump installation.


Replies

pjc50last Tuesday at 12:57 PM

Why is that required? Switch to three phase? Wasn't required for me in the UK.

show 1 reply
bratwurst3000yesterday at 9:35 AM

smart meters are paid by the grid operator and you have to pay maximum 50€ a year for a smartmeter. I honestly dont know where you get your numbers. a friend with a big house and 3 children switched to air water heatpump with floor heating etc and it was 18k€ and half of that paif by the state and the smart meter was mostly free( he pais 25€ a year for it).

and this is a hugeeee house. No solar but he is working on it.

could you link some proof of this smartmeters I have to pay? Or some calculations from firms it whatever that proof your point.