I distinctly remember reading that the entire bill of materials for building a Boeing 747 was managed in Excel. I have not been able to find that claim since then but it was so amazing to me that I remember it.
It doesn't really make sense as I think about it now, because the 747 design predates Excel by many years so maybe it was BS.
I distinctly remember reading that the entire bill of materials for building a Boeing 747 was managed in Excel. I have not been able to find that claim since then but it was so amazing to me that I remember it.
It doesn't really make sense as I think about it now, because the 747 design predates Excel by many years so maybe it was BS.