troupotoday at 12:30 PM3 repliesview on HN

> this must be something with fast cold start. So black/brown coal power plan will not help you, similarly nuclear.

Nuclear plants provide base load and they are extremely fast at ramping up/lowering production. All modern nuclear plants are capable of changing power output at 3-5% of nameplate capacity per minute: https://www.oecd-nea.org/upload/docs/application/pdf/2021-12...

You don't shut down power plants. None of the power plants ever do a "fast cold start"

> The end result now is that electricity in Europe is the most expensive on the World, so all manufacturing is moved to Asia

The production moved to Asia due to extremely cheap labor, not due to electricity costs.


Replies

sehansentoday at 1:28 PM

5% per minute is not extremely fast. Simple cycle gas turbine (peaker) plants routinely go 0 to 100% in less than 10 minutes. Nuclear plants can only hit 5% per minute in the 50 to 100% interval (per your own source).

And all of this is confused by the way the nuclear industry uses the term "load following". You'd think it means "changing the power output from moment to moment to match electricity demand" but for nuclear plants it means "changing from one pre-planned constant level to another pre-planned constant level, up to four times per day".[0] There are only three[1] sources of electricity that can be ramped freely enough to exactly match demand: hydro, simple-cycle gas turbines and batteries. All electrical supplies will need some of those three mixed in. Which is why France is still 10% hydro and 10% natural gas in their electricity supply.

0: Some of the most modern Russian plants can move to +-20% of their current target at 10% per minute, but "the number of such very fast power variations is limited, and they are mainly reserved for emergency situations." per your source.

1: OK, there are some obsolete ways too, like diesel generators. At least obsolete at the scale of the electricity grid.

show 1 reply
Scoundrellertoday at 1:04 PM

For the foreseeable future, building enough nuclear for peak capacity is exceedingly expensive.

> None of the power plants ever do a "fast cold start"

Somewhere in each grid you will have “black start” capacity contracts, dunno if nuclear can fills this role (or if grids exclude nukes for one reason or another).

Plenty of peaker plants built with the intention of running double digit hours per year and therefore the tradeoff supports being largely “off” in between those calls. Batteries might fill that gap.

crotetoday at 1:22 PM

> Nuclear plants provide base load and they are extremely fast at ramping up/lowering production

The obvious counterexample is Chernobyl, where a big contributor was the fact that they were unable to scale it down & back up as desired. Yes, nuclear reactors can scale down rapidly - but you have to wait several hours until it can scale back up!

Besides, the linked paper only covers load-following in a traditional grid (swinging between 60% and 100% once a day) and barely touches on the economic effects. The situation is going to look drastically different for a renewables-first grid, where additional sources are needed for at most a few hours a day, for a few months per year.

> You don't shut down power plants. None of the power plants ever do a "fast cold start"

Gas turbines can. Hydro can. Battery storage can.

show 2 replies