If someone takes it near the power plant, and all the infrastructure is there for it. You don't build a (large) nuclear power plant just for these customers though. Generally, with a high amount of renewable but fluctuating supply, we have to get away from the base load model, towards a residual load model.
The burden of buffering the fluctuation is on those creating the fluctuation, not on those not doing so.