800V to each rackmount unit, with hot plugging of rack units? That's scary. The usual setup at this voltage is that you throw a hulking big switch to cut the power, and that mechanically unlocks the cabinet. But that's not what these people have in mind. They want hot-plugging of individual rackmount units.
GE has a paper about the power conversion design, but it doesn't mention the unit to rack electrical and mechanical interface. Liteon is working on that, but the animation is rather vague.[2] They hint at hot plugging but hand-wave how the disconnects work. Delta offers a few more hints.[3] There's a complex hot-plugging control unit to avoid inrush currents on plug-in and arcing on disconnect. This requires active management of the switching silicon carbide MOSFETs.
There ought to be a mechanical disconnect behind this, so that when someone pulls out a rackmount unit, a shutter drops behind it to protect people from 800V. All these papers are kind of hand-wavey about how the electrical safety works.
Plus, all this is liquid-cooled, and that has to hot-plug, too.
[1] https://library.grid.gevernova.com/white-papers-case-studies...
[2] https://www.youtube.com/watch?v=CQOreYMhe-M&
[3] https://filecenter.deltaww.com/Products/download/2510/202510...
Or maybe you can require technicians to be in full-protection electrical suits.
It is a pretty clever design
> When it is detected that the PDB starts to detach from the interface, the hot-swap controller quickly turns off the MOSFET to block the discharge path from Cin to the system. After the main power path is completely disconnected, the interface is physically detached, and no current flows at this time
> For insertion, long pins (typically for ground and control signals) make contact first to establish a stable reference and enable pre-insertion checks, while short pins (for power or sensitive signals) connect later once conditions are safe; during removal, the sequence is reversed, with short pins disconnecting first to minimize interference.