I didn't say they weren't cheap. I said you were being misleading. I'm not rebutting your thesis. I'm rebutting your defense of it.
They're so cheap they get over-provisioned on purpose. Can you imagine some guy speci'ng switchgear and transmission lines for a coal or gas plant that can't handle the plant running full tilt? Yeah me either. But that's exactly how it's done for renewables because that's where the sweet spot of cost-benifit is.
A dozen 10mw turbines might be fed through 100mw of transmission hardware. They can never produce their rated 120mw because liquid copper would happen if they did. But they were intentionally provisioned that way so that based on weather patterns and whatnot they'd be able to expect say 80mw a certain number of days per year.
There are untold numbers of renewable installations out there that cannot supply their nameplate capacity to the grid in such a manner.
There is nothing wrong with over provisioning cheap renewable power generation when it is economically superior to building fossil assets that will end up stranded. As long as grid demand is met and it is cheaper to build renewables and batteries to do it, it will be done, and that is the path we're on.
If gas plants cannot economically compete, they will not be built or fired. And the evidence shows they cannot compete, regardless of their competing capacity factor and dispatchability.