Nice article, although I'm not so sure about this part:
> There’s a reason why there wasn’t an Apollo 18, or 19 and 20. Even though funding had been secured, an executive decision was made to kill the program early, because LoC was inevitable.
Was funding really secure? I believe that was the main sticking point; a quick search [0] seems to confirm this, and the John Young quote below backs it up: "Even if they’d had the money..." Not to say the risk wasn't a factor too of course, but it doesn't look like funding was otherwise guaranteed.
Anyway, I think what sets the risk of the Shuttle apart from Apollo is summed up nicely in one of the quotes (in reference to the Apollo program): "The awareness of risk led to intense focus on reducing risk." In the Apollo program, there was a pattern of rigorously hunting down and eliminating any possible known risks, leaving unknowns as the primary source of risk; on the other hand, the Shuttle program let known risks accumulate continuously until crews paid the price for a bad draw.
When debris hit Atlantis on STS-27 [1] and the shuttle only survived on a one in a million stroke of luck -- the completely broken tile happened to be over an aluminum mounting plate -- it should have been taken as a free lesson on one more known source of risk to eliminate. Instead, it led to seven people dying completely preventable and unnecessary deaths a few years later.
Spaceflight is inherently risky, it's true. That's why things like the Orion heat shield are so worrisome; because it is physically possible at our current level of technology to make it safer, and yet for political / funding / etc. reasons we're not doing the best we can.
[0] https://airandspace.si.edu/stories/editorial/why-did-we-stop...
> one more known source of risk to eliminate.
How could they have eliminated that risk?
The Saturn V's existed. Saturn V serial numbers were designated as S-5## where # is an increment from 1. https://en.wikipedia.org/wiki/Saturn_V#Launch_history <--- see the Saturn V numbering scheme here.
SA-513 was repurposed from Apollo 18 to Skylab. SA-514 was meant for Apollo 19. They put it on display. SA-515 was also chopped up and put on display. Some parts were used in Skylab. https://www.space.com/nasa-extra-apollo-moon-saturn-v-rocket...
So there were 3 Saturn V already assembled and in existence.
Did the CSMs and LEMs exist? CSMs had a similar serial number scheme. And they designated "Block 1" and "Block 2" (iterations of the spacecraft design based on testing) CSM-0## and CSM-1##
The CSM used in Apollo 17 was CSM-114. On wikipedia it says that CSM-115 and CSM-115a were never fully assembled and cancelled, but if you look past that, you can also see that Skylab used, CSM-116, CSM-117 and CSM-118. These were Apollo CSMs, fresh off the same assembly line. https://en.wikipedia.org/wiki/Apollo_command_and_service_mod...
So there were 3 CSMs.
What about LEM? Similar number scheme, LM-## which is incremented with each one made. So first one was LM-1 and the last one used on Apollo 17 was LM-12. LM-13 is on display in a museum. LM-14 was on the production line (along with LM-15??) and a "stop work" order was issued and they were scrapped. Yes, they were literally broken down and turned into scrap. https://www.businessinsider.com/nasa-lunar-modules-lm14-lm15...
So NASA had 1 LEM and 2 were on the way. I think, we can charitably say that there were 3 LEMs available at the time. I think it's fair to say that...
There were 3 LEMs.
Did they have 3 crews? Funnily enough, they did have 3 crews already assigned! What a coincidence. https://web.archive.org/web/20181224161154/https://nssdc.gsf... :)
So the Saturn Vs existed and had been paid for. The CSMs existed and had been paid for. The LMs existed / were on the line and had been paid for. The crews existed (and had been partially paid for).
So what is the "funding shortfall" that caused America to stop going to the moon?
The "funding shortfall" here is the money required to pay for the ground crews and personnel for carrying out the mission. And that amount was $42.1 million out of $956 million for Apollo. The total NASA budget was, $3.27 billion that year.
$42.1 million. NASA admin just couldn't find $42.1 million of ground staff salaries etc out of the remaining $2.3 Billion budget.It's probably a coincidence that this happened right after Apollo 13. The decision was announced on September 2nd, 1970. Apollo 13 happened in April, 1970.
----
So yes, the funding was there. I suspect the "funding cut" argument was an attempt to save face; after the US Government (and I mean the Government, it's clear both the White House and Congress were involved) decided to cut the cord post-Apollo 13.
I also suspect this is one of the many "open secrets" lost to time. It might have been known by "everyone" in the know at the time, but those who knew died off, and history crystallized around the written page.