logoalt Hacker News

tlbtoday at 10:54 AM2 repliesview on HN

Field termination is necessary when the connectors are too large to pull through a conduit. But if they were USB-C sized, you could just pull fully assembled cables.


Replies

Someonetoday at 11:08 AM

It also comes in very handy when you need a 8m cable, but only can buy them in lengths of 5m and 10m, or when you’re wiring an entire building, and figuring out which lengths to order up front is a major pain in the ass, certainly compared to ordering a few hundred meters of cable, a few hundred connectors and tools to put the two together. And that’s ignoring the price difference.

goaliecatoday at 11:07 AM

It’s also about managing length and slack.