Interesting case:
- a project manager vibe-coded the change without thinking it through at all
- the PR was reviewed by an LLM
- an actual engineer gave LGTM without really reviewing the changes, trusting the LLM
Did I get this right?
The LLM actually points out the problem tho
The LLM actually points out the problem tho