logoalt Hacker News

0cf8612b2e1eyesterday at 10:15 PM1 replyview on HN

The permitting slowdown is if it want to connect to the grid. If you want to run solar behind the meter, you can go nuts.


Replies

Karrot_Kreamyesterday at 11:31 PM

Sure but acquiring enough land to build solar profitably near a DC that can hook up to the big US interconnects is very expensive and will often be blocked by residents. If you want to build solar where there are few people and cheap input costs, then you need to transmit the power to the DC.

show 1 reply