> 40-60% boost
Where? What industry, what kind of projects? The only one where I can imagine it to be true is vulnerability research, and I imagine all the low-hanging fruit to be picked soon
I work on an ETL platform and it definitely is a huge boost in certain things, but a drain in others.
We started working on a new product a few months ago and it's really dangerous up front on an empty code base. It can quickly write more code than you can comfortably understand. The more serious danger is when three people are all doing that at once. I had to bring this up at meetings and try to get a better review culture going.
Now that we're a few months in and changes are more targeted additions to an existing system we're happy with, it's _huge_ (which has been my experience on our existing product). I can drop a brief paragraph I speech-to-texted into my agent, give it a general starting place (where I imagine the issue/feature extension point is), and then tell it to do some research and propose a change. I'd guess it's about 50% of the time that I have to update it's implementation plan. Then I let it run (my favorite is setting this up before a meeting) and come back. Then we have to review the code and go from there.
Definitely a 50%+ speed up in some cases, but not all. It's also great for problems that procrastinating, as it reduces friction so much.
Any typical web backend or frontend kind of thing. So like, not systems code.
Mine, easily. Senior (near staff) level embedded engineering.
It will spin up a boilerplate uboot or BSP config no problem. I still go in and manually check and add peripherals, but opus 4.7 is terrifyingly smart.
Need to modify or add a new peripheral, it's there no problem. Or in a bare metal project, I can point it at an STM32 cubemx starter repo and ask for a feature (set up the ADC on pins 4 and 7, ask me for parameters) and it's just done. I do in a day what would probably take me 2.
It doesn't help me with reviewing others' work, or planning (I maintain that these are manual tasks). So yeah, I agree with the 40-60%. The parts of my job it helps, it really helps.