Glad to hear it.
An underground K-Line extension was recently approved to go through my neighborhood. This is after a small handful of 2-3 homeowners caused it to be delayed by 18 months over objections that seismic activity from drilling would be noticeable under their homes.
The city spent a year doing a study and report to appease the concerns of these residents, who - when presented with this extensive report showing that it would NOT be noticeable - proceeded to disregard the opinion of the city engineers and continue blocking it with the help of the Mayor, who is a friend.
Thankfully their objections were finally outvoted. West Hollywood had put up several billion in matching funds to pay for the extension, and if things had continued to drag on, the offer would have expired and jeopardized the entire project.
> West Hollywood had put up several billion
West Hollywood has several billion dollars? To spare?
Exactly. This line was actually planned for in the approved Measure M Ballot Measure in 2016 to be “shovel ready” [environmentally cleared, funding identified, etc] by 2022, with optimistic projections hoping construction would be finished by 2028. Clearly, we’re at least 6 years behind schedule, considering the final funding votes and route design specifics won’t be set until then, much less construction. It was not a surprise, so I consider any further delays on that front by detractors to be in bad faith, and I am happy that Metro has started to put its foot down and force progress, albeit I wish they would have done so sooner.
Nevertheless, I think it’s a good sign of government inertia that we won’t run into a 60 year delay ever again, especially as Metro prepares to finalize approval of the Sepulveda Pass Subway from LAX to the Valley.