logoalt Hacker News

AngryDatayesterday at 4:57 PM2 repliesview on HN

I mean that doesn't sound like very big hurdles. It is an inspection of a completed reactor to make sure it wasn't managed and built like trash. Every factory and business and powerplant is subject to an inspection before it can operate. Even most residentual homes require an inspection before people can live in it.


Replies

jauntywundrkindyesterday at 6:42 PM

This is a sodium fast reactor, which is far more advanced than most nuclear reactors, at high temperatures (not that bad: "only 510 C, 950 F). Sodium is infamously hard to deal with, incredibly reactive to water, capable of embrittling metal, and any impurities in the incredibly hot loop can dissolve and transfer and create incredibly corrrosive systems.

Superphenix in France (1973-1998) and Monju in Japan (1994-1995, 2010-2016) have both had significant technical challenges. The Soviets built have some sodium reactors.

I used to be very for a PRISM style reactor like TerraPower is working for, especially with something like Integral Fast Reactor's on-site non-proliferation-safe pyroprocessing. But man, over the years, I just appreciate more and more how hard it is to build and maintain well. I'm both rooting for TerraPower, but also, it low key feels like an "if not when" situation, that this an incredibly energetic unsafe system to be dealing with, and it seems hard to imagine this being a safe long term cost effective solution. I hope the inspections are very very for real, very in depth, very detailed, given the scope of what is being built. It's not even a big reactor! But that much very high temperature sodium going around, right by a big nuclear reactor (smartly TerraPower has separate nuclear and energy "wings), is deeply concerning, and needs incredibly detailed inspections if this is to provide the lasting safe value it is purporting to deliver.

lazideyesterday at 5:03 PM

It is what typically all reactors get stuck on for years - or often decades.

show 1 reply