> You are correct. But transmission lines do exist and synchronization would be possible. The baltic countries have done so in 2025 to get away from the Russian grid.
There's no point in synchronizing the Nordics / Britain / Ireland with CESA grids since they are interconnected with HVDC rather than AC.