> Gas is the cheapest, fastest zero-to-production choice for onsite power generation, and has been for a long time.
Is it, though? There's a ton of projects out there waiting to get their solar on the grid in west Texas, partnering with one of them and launching the project early while waiting on the interconnection queue, and adding enough batteries, gives a more robust solution right now without the SPOF nature of large single generators.
Add to that the long backorder list for gas turbines right now, with no end in sight, and I'm surprised that Microsoft would power this particular location with turbines because it's probably their best chance to do off-grid massive solar projects.
Massive off-grid solar is what China is choosing for some absolutely massive new industrial projects. Nuclear is a no-go because it takes so long to deploy, but solar + batteries are cheap COTS and available in abundance, unlike gas turbines.
>Is it, though?
When you can colocate across the street from someone who's otherwise paying to get rid of it is.
When the fuel is free-ish who cares about backorder on turbines. You can run big diesels on NG (just like the pipeline people do).
> Is it, though?
Yes.
There is no point in waiting for interconnection when you can just... not do that, and do all your generation behind the meter, with complete control of the generation to match your load. Solar wants an interconnect so they can sell off surplus; with gas you just turn the dial down to meet the load and walk away.
The clock is running on the datacenter goldrush. 70-90% of the capex window is going to be soaked up just with construction time. Introducing a capricious ERCOT permit process and shopping around for friendly solar projects to hop in bed with makes no sense when you can just write a check and solve the problem forever.
I'd bet the deal with Chevron was to enable Microsoft to hop the queue here and get those GEV turbines soonest.
Good luck. The renewables overbuild required to firm baseload demand for a datacenter is insane. You need something like 4x solar and 1.5x storage in a 10hr battery.
Respectfully, the laws of NPV and IRR hurdles don't matter in Chinese infrastructure.
Whatever you choose in the US, it's not cheap, and developers crawl over each other to sign up hyperscalers. Race to the bottom.
>Add to that the long backorder list for gas turbines right now
If demand > supply then the price goes up. Doesn't mean you can't buy something though.
> Is it, though? There's a ton of projects out there waiting to get their solar on the grid in west Texas,
gas turbines run at night too so there's no storage/backup supply issue to consider. They also take up significantly less space than wind or solar and those data centers are already gigantic.