_aavaa_yesterday at 8:17 PM3 repliesview on HN

Title is misleading, they want to start building not “build” (I.e. be operational).

Though that only moves the needles from impossible to laughable.

> If our goal is to double our grid and build a low-carbon economy in less than 25 years, there is no credible plan to do that without nuclear energy

There are plenty of credible plans, they all involve wind and solar. But as anyone watching clean energy news will know, Alberta is trying its hardest to get rid of all wind and solar development from the province.

As for the baseload argument, they already get >60% of the electricity from hydro and nuclear. How much more baseload do you really need? 100%?


Replies

barbazooyesterday at 8:41 PM

Doesn't nuclear make sense to increase baseline capacity where hydro isn't available?

zybftjmvsyesterday at 8:25 PM

A village near me in southern Alberta just built a huge wind farm.

show 1 reply
hodderyesterday at 8:25 PM

The claim that Alberta is actively trying to get rid of all wind and solar development is internet hyperbole that ignores real capacity data. Alberta actually ranks second in Canada for clean energy growth, and its renewable output surged by over 25% year-over-year into 2026.

The high-profile project cancellations people point to weren't a government ban. They happened because the province changed its transmission rules. Previously, ratepayers subsidized the massive utility costs required to connect remote wind and solar farms to the central grid. The province ended this, forcing private developers to internalize their own grid connection costs. Once forced to pay for their own infrastructure, highly speculative, unfinanced projects simply became economically unviable and dropped out of the queue.

If a private wind or solar developer wanted to build a massive farm in a remote, rural area (like Southern Alberta) where land is cheap but high-voltage power lines do not exist, they only had to pay for the immediate wire connecting their project to the nearest local substation. Taxpayers were subsidizing those players, because it was a "load pays" system.

Please do not fall pray to the general trope that Alberta is a backwards hillbilly province. Subsidizing private developments with public money is not something that should be encouraged.

On Canada broadly, you are correct in your baseload numbers and I agree with you.

(Energy trader here)

show 2 replies