Makes alot of sense. Canada has:
- one of the largest uranium reserves
- a well respected and safe nuclear design in CANDU
- experience with building and refurbishing nuclear reactors(Darlington)
and for Ontario itself A need for more baseload to work with the large amount of solar and wind that Ontario has added in the last 10 years.
Saskatchewan also now has a potential need for nuclear for industrial use now that wasn't present before from its existing population.
if the government can clear the red tape by using a well tested reactor design then they could certainly get some of these reactors built in that time frame.
15 seems...ambitions, but if we're going to spend at a federal level this is probably one of the better things to invest in.
They don’t seem to have any plans to build more CANDU, in so many ways the world has moved on for instance those centrifuges have made uranium enrichment more economical for most countries except (seemingly) the US and Iran.
What is exciting to me is that these just installed the first module of the BWRX 300 at Darlington. I was so afraid that BWRX was going to be another SMR that gets talked about for decades but it looks like they are really doing it. See https://www.autonocion.com/us/canada-tonne-grid-nuclear-reac... !
> Ontario itself A need for more baseload to work with the large amount of solar and wind that Ontario has added in the last 10 years.
Chasing baseload is a fool's game. You will always have a mismatch between power needed and power produced. Power storage is necessary to move excess power produced to times of excess power need. e.g., shave the peaks to fill the valleys.
Any storage reduces the need for baseload and peaker plants. 4-6 hrs move daytime excess solar to fill evening needs. Overnight baseload excess can refill the batteries to cover the morning excess need before solar fully kicks in. Expanding battery capacity to 8-12 hours further reduces the need for expensive power sources such as nuclear and gas.
More renewables means the need for more base load? This is the first I’ve seen anybody say that.
Always amused me that on the face of things, a CANDU looks just like a sideways RBMK. At least in terms of plumbing. There's clearly more to it than that.
I don't understand the online obsession with nuclear power in spite of all the evidence that it's simply not economical. Canada needs new power now. Not 15-20 years from now, which is how long it takes to build a new nuclear power plant. And it can be done today, incrementally with renewable sources and before anyone screams "baseload", that's what batteries are for if it really comes down to it.
Nuclear power is the highest cost source of electricity in LCOE terms [1]. We just need to look at Hinkly Point C ("HPC") in the UK. HPC was proposed in 2010, approved in 2016, began construction in 2018 and is scheduled to completion currently somewhere between 2029 and 2031 for the first reactor with the second following 1-3 years after (IIRC). From an initial cost estimate of 15 billion pounds in 2015, it's ballooned to 31-35 billion and may well exceed 50 billion [2][3].
The contracted price per MWh is linked to inflation and currently pushing 140 pounds, about 50% more expensive than offshore wind that could be built in a fraction of the time.
So there is a 35 year contract period for power but HPC has a lifespan of 60 years. What happens after? Market rates. Many will argue it'll get cheaper as the plant is paid off. If that's the case, why hasn't electricity from nuclear sources gotten cheaper as the existing plants have aged?
The answer is the same with any nuclear criticism: "this time it'll be different". Fukushima? "This time it will be different." Chernobyl? "This time it will be different." Spiralling costs? "This time it will be different." Massively delayed completion dates? "This time it will be different."
And we haven't even touched the negative externalities yet. That is, the uranium fuel cycle. Processing uranium ore produces waste. Using fuel rods produces waste. We don't really have a good solution for dealing with that waste. There's a lot of hand-waving about "just store it underground and centuries from now we'll hope they've figured it out". Storage, particularly for the first decade or more is not as easy as the hand-waving makes it out to be. It requires cooling ponds because the waste still produces significant heat. So you need infrastructure from that. UF6/UF4 from procesing aren't a solved problem either.
I will never understand why so many otherwise smart people keep trying to make nuclear happen in their minds.
[1]: https://en.wikipedia.org/wiki/Levelized_cost_of_electricity
[2]: https://www.world-nuclear-news.org/articles/edf-announces-hi...
[3]: https://www.telegraph.co.uk/business/2026/02/20/hinkley-poin...
15 years, to be clear.
[dead]
>15 seems...ambitions, but if we're going to spend at a federal level this is probably one of the better things to invest in.
If they can make them cookie cutter as much as possible and not unique snowflakes like has been the pattern at least in the US, they can probably do it both on the timeline and a somewhat reasonable cost basis
If they build 15 individual projects instead of managing this as a single big project, yeah that is very ambitious