How long did this take?
It took about 2 days to get a proof of concept, and about a week to get something I could ship to production.
I skipped a few features for the PoC (like XML tag support, token positions), so most of the delta was adding those back in!
About 1/1000 of the duration of their interview process where they gloat about wasting your time.
It took about 2 days to get a proof of concept, and about a week to get something I could ship to production.
I skipped a few features for the PoC (like XML tag support, token positions), so most of the delta was adding those back in!