While it can be productive, I never feel like I'm in a flow state doing this. The general context switching can actually be a bit draining to me.
It’s a good reflection of my energy leve.
Sometimes I’m working within 5 projects all with 1-3 agents running. Other times I’m maxed out on one agent running in a single project.
Quite draining, I hope this is not what the future holds.
It’s a good reflection of my energy leve.
Sometimes I’m working within 5 projects all with 1-3 agents running. Other times I’m maxed out on one agent running in a single project.