Another issue is that a lot of those office buildings use post tensioned cables in the concrete slabs so making a hole needs to be done very carefully to avoid the cables. Not only do the cables provide a lot of structural support but breaking a cable is like cutting a stretched rubber band except with steel cables and with literally tons of force stretching the cables.