But... Datacenters don't burn anything, right? Powerplants do and we try to switch all the transport and heating and whatever to be electric.
So the answer is to build the damb nuclear power and a lot of it and price CO2 emissions at the actual cost of sucking the thing back out if the atmosphere
> price CO2 emissions at the actual cost of sucking the thing back out if the atmosphere
This is the only relevant bit actually. The rest will follow from there. And in principle, at least in Europe, we already have some mechanisms to do this. We'd "just" have to up the prices.
BUT of course with the right wing on the advance, and with them having identified basic physics (i.e. climate change) as a culture war terrain, this keeps being watered down... Oh well... This is why we can't have nice things... like a future...
They do have a growing amount of Scope 1 emissions (emissions from their on site sources) which originally was primarily on site diesel but due to grid interconnect delays have been growing number of on site gas turbines.
This certainly wouldn’t be necessary with adequate generation and transmission capacity.