Four more 2nm (or below) fabs in Arizona. That's bleeding-edge or very close to it.
By end of decade, no? Seems like domestic fab will always be two steps behind. I assume by design.
They're building 1.4nm in Taiwan
Will they remain bleeding edge by the time they are operational?
By end of decade, no? Seems like domestic fab will always be two steps behind. I assume by design.