I would think that data centers would be using as much prefab / modular construction as possible and on-site work would be as limited as possible.

Those prefab factories may not exist though, and companies want to build out now before the market is mature, instead of a long-term play.


Replies

bluGilltoday at 8:41 PM

They likely are. However you still need someone to connect the wires to each prefab section.