It was pretty far down there, snuck in between some animated-in photos, but:
> Due to the placement of the machines under the hoistways, and the need for proper rope lead off of the overhead sheaves, the counterweights did not run in the same hoistways as the cars. This makes for a long, complicated rope scheme – each car had over ¾ of a mile of hoistrope!