Try doing the math and ask why your time costs. You need to buy a lot of storage to pay for the engineering work and most places would prefer to spend that time and attention on the product rather than shaving a few percent off of the storage bill (especially since the savings will be negative for quite some time).
Try doing the math and ask why your time costs. You need to buy a lot of storage to pay for the engineering work and most places would prefer to spend that time and attention on the product rather than shaving a few percent off of the storage bill (especially since the savings will be negative for quite some time).