planned 6 orbits, 10hr's in space the load of satelites will deploy 10x the banwidth of a single falcon launch making the economics of this venture rather startling for any 'competition'. if they nail the deploy, relights, and soft landings, it will time for everybody to rethink everything * * keep in mind they are already tinkering with on orbit fuel tranfer technology, which will lead to routine bunkering * other things, like doing visual condition inspections of every ship in orbit means there experience base grows at a rate that other companys litteraly cant imagine.
How can you compare the economics of it if you just have the bandwidth and not the cost?