This is a 10th Generation Boiling Water Reactor. Here's some relevant links:
https://en.wikipedia.org/wiki/BWRX-300
https://www.gevernova.com/nuclear/carbon-free-power/bwrx-300...
Interesting point: no pumps; convection flow for 100% of the operational envelope.
Place your bets now.
Time until first power generated, and actual final total cost.
I’ll go 15 years and $10 Billion.
This is a 10th Generation Boiling Water Reactor. Here's some relevant links:
https://en.wikipedia.org/wiki/BWRX-300
https://www.gevernova.com/nuclear/carbon-free-power/bwrx-300...
Interesting point: no pumps; convection flow for 100% of the operational envelope.