Sounds like someone needs to develop an autonomous snowblower for narrow streets.
The problem is not plowing the streets, it is moving the snow away from the streets. After heavy snowfalls, plows create huge piles that block a significant part of the road. This is a difficult problem that simply takes a lot of resources to address.
California did back in the '90s.
https://path.berkeley.edu/automation/development-advanced-ro...
It had hands free operation (still needed someone in the seat to control the plow) and lane assist in whiteout conditions when the outside edge of the lane had a cliff (much worse than driving into the ditch).
https://path.berkeley.edu/automation/development-advanced-ro...
> This project is one of the first real-world applications derived from PATH/Caltrans research in the area of automated vehicle control. A modified snowblower with add-on sensors, actuator, computer and driver interfaces was developed, and initial field tests were conducted along the 8 guardrail sections between Kingvale and Soda Springs on the shoulders of Interstate-80 near Donner Summit.
https://path.berkeley.edu/wp-content/uploads/2024/11/develop...
> Various lateral sensing and referencing technologies were investigated for this application; what was found was that machine vision does not penetrate snow, and that the GPS system does not provide sufficient reliability under possible multipath and blockage scenarios. A magnetic-marker-based sensing system was chosen for the initial implementation primarily because of its high reliability and accuracy (better than 1 cm) under all weather conditions. The mountainous highway I-80 near Donner Summit (close to Lake Tahoe) was chosen to be the first field test site. In 2001, magnets were installed along the eastbound and westbound guardrails of I-80, at 4 feet apart and 4 feet away from the guardrail. Binary coding of the magnetic markers was designed (north pole up vs. south pole up) to provide information about guardrail characteristics, such as the shoulder side (right or left of the blower) and the end of guardrail. Eight sections of the guardrail were equipped with magnets for the initial feasibility operations with a total length of 1.46 km (0.9 mile) between Soda Springs and Kingvale.