I wouldn't have believed you but it will take close to a decade to build under like half a mile of sidewalk near me with like actual construction time planned in weeks in contrast to the overall plan.
I don't think I would blame the environmental consultants though. This is just how we do things now.
The USD 2B path train stop at WTC became USD 4B+ and nobody went to prison for it. I don't think it should have even been USD 2B. All we needed was a path train stop.
*This is how we don’t do things. The whole process is optimized to ensure the least possible amount of things actually get done