> AI will end up being just slightly more expensive than the raw electricity required to produce it.

AFAICT, this hasn't happened for any "cloud" compute company that has been in business for -say- at least five years. Unless your prediction is that roughly no one will use "cloud" "AI", I'm rating this prediction as "totally bogus". And if that is your prediction, then what you're saying is

  Assuming that you're not doing anything that needs exotic system administrators, nearly all of the cost of computing when you own your own hardware is the power for that hardware.
which... unless you're buying used hardware, I don't think that's true, either. Hetzner quotes a max of 167.23 EUR/month for a full rack and what I think is 2400W of power, and lists the rate for Finnish power as 0.22 EUR per kWh. [0] If we assume that Hetzner's spending cap doesn't apply and we are forced to pay the full quoted rate for power in Finland, I think that works out to a bit under 4.6K EUR per year:

  240V * 10A = 2.4kW
  2.4kW * 24H * 30 * 12 = 20,736 kWh
  20,736kWh * 0.22 EUR/kWh  = 4562 EUR/year
The last time I got quotes for most of a rack of server hardware was like a decade ago, and that pretty-bog-standard server hardware ran around 200K USD. If we assume a ten-year expected life [1], that hardware cost about 17K EUR per year. Assuming I haven't fucked up my math, [2][3] the cost of the hardware here is more than three times the cost of power.

Note that I'm using roughly decade-old hardware prices and allegedly-current electricity prices. If we used hardware prices from two years ago -or worse, from today- the hardware would cost far more per year.

[0] <https://www.hetzner.com/colocation/>

[1] ...which I think is between two and three times longer than is standard to expect in the business world...

[2] ...it's very likely that I have! Corrections are definitely welcome.

[3] ...it's also possible that USians get gouged for server hardware and that it's like a quarter of the cost if you buy it in Finland. I expect that there's definitely a price difference, but I doubt that it's very large.


Replies

vannevar • today at 4:56 AM

>AFAICT, this hasn't happened for any "cloud" compute company that has been in business for -say- at least five years.

Most cloud software has had moats. AI does not. And AI is eating software, which means those historical margins are going away for a lot of cloud software,too. That's what the SAAS-pocalypse is about.

>Assuming that you're not doing anything that needs exotic system administrators

Remember, these are also going to be AI.

>Assuming I haven't fucked up my math, [2][3] the cost of the hardware here is more than three times the cost of power.

This is a fair point, but it just means the COGS is higher, not that the margin is any better. I stand by the prediction that AI margins will be very slim.

➕ show 1 reply
Tanjreeve • today at 4:43 AM

Even if that scenario did happen (I agree I don't think most of the major providers would survive on a commodity utility model). Most of the advances in AI are driven by huge amounts of funding for research. If everyone goes to open source models/utility based pricing etc then it'll be cheaper but the current rate of improvements are being overwhelmingly driven by the frontier labs (for better or worse) and they're being driven by vast amounts of VC funding predicated on making vast amounts of money.

I'm very dubious we can have our cake and eat it of constant magnitude order improvements and also commodified utility pricing.

vatsachak • today at 2:54 AM

What? You're saying that Hetzner is losing money?

168 * 12 < 4562

➕ show 1 reply