LarsDu88 • today at 4:50 PM • 4 replies • view on HN

Possible data center bans incoming + tons of GPUs sitting in warehouses due to lack of power infrastructure to power them.

Perhaps a flood of 8x B300 will be homelab ready in a few months


Replies

NitpickLawyer • today at 5:10 PM

> a flood of 8x B300 will be homelab ready in a few months

Haha, that's beyond wishful thinking, I'm afraid. We're not even seeing a flood of A100s (6 yo and several generations old). Every GPU is still being squeezed right now, and the trend will probably continue for the foreseeable future.

➕ show 1 reply
x187463 • today at 5:19 PM

The world is bigger than the US. If the political climate in the US obstructs the build out, the build out will occur somewhere else.

➕ show 3 replies
swingandamiss • today at 4:57 PM

No, they'll be shipped off to Asia where technology is embraced.

➕ show 1 reply
viccis • today at 5:21 PM

>Possible data center bans incoming

A lot of the data center build out has been bipartisan. Unless Dems realize they need to listen to their constituents to avoid a 2028 bloodbath (they probably won't), I wouldn't count on that to save us from RAM/GPU prices.